Table 11.2: |
Recommended Schedule and Order of Magnitude |
|
Priority |
Improvement |
Cost
Estimate |
|
1 |
Widen
Highway 12 to four lanes east to 45th Street. |
$2,000,000 |
|
2 |
Widen
Highway 2A through the Town. |
$5,750,000 |
|
3 |
Construct
63rd Avenue between C&E Trail and 58th Street. |
$4,000,000 |
|
4 |
Re-connection
of C&E Tr between 54th Ave and Woodland Dr. |
$1,500,000 |
|
5 |
Re-construct
Wolf Creek Drive between Highway 2Aand Highway 12 as a four lane
industrial major roadway. |
$2,250,000 |
|
6 |
Highway
2A service road improvements at Woodland Drive. |
$375,000 |
|
7 |
Highway
2A service road improvements at 63rd Avenue. |
$250,000 |
|
8 |
Highway
2A service road improvements at Dicken’s Lane. |
$50,000 |
|
9 |
Construct
West Side Rd between Highway 12 and 63rd Avenue. |
$2,750,000 |
|
10 |
Construct
46th Avenue between C&E Trail and 58th Street. |
$500,000 |
|
11 |
Re-construction
of Highway 12/Wolf Creek Drive intersection and service road intersection
(north side). |
$1,000,000 |
|
12 |
Re-construction
of Highway 12/West Side Road intersection. |
$2,000,000 |
|
13 |
Re-construction
of Hwy 12/45th St and service road int. (n. side). |
$385,000 |
|
14 |
Construct
Wolf Creek Drive south of Hwy 12 to 46th Avenue. |
$1,500,000 |
|
15 |
Construct
58th Street extension east to C&E Trail. |
$3,750,000 |
|
16 |
Signalization
of additional intersections as per Table 8.7. |
$150,000
- $200,000 each |
|
Note: |
Note that these estimates do not include shallow utilities, professional design fees, land/easement acquisition, soil reclamation or other third party costs. Note also that these cost estimates are representative of “typical” construction projects and do not reflect all topographic, hydrographic or other details. More detailed functional planning studies would be required in order to more accurately assess these construction costs. Of particular note is the extension of 63rd Avenue west to 58th Street. |